May 25, 2020 - Panama Canal Transit
May 25, 2020 Canal crossing commences at 3:30 am. At 6:50 am we can see Raven exiting one of the chambers of the Gatun locks. Later we see her entering a chamber in the Pedro Miguel lock at 11:36 am with her companion vessel following, and later into the next chamber.
Unfortunately, during the transit, Nikolay finds the bow thruster not working. Performing some fast trouble shooting, he learns that a lot of return current had flowed through the bonding wire, versus the ground wire, and fried it.
Quickly rig-up a replacement and continue on with minimal use of the thruster.
Things not found during survey:
- Thruster ground wire issue
- Stabilizer system in need of significant maintenance even though reported they had been serviced in September 2019 (more later)
- Failed Balmar regulator and missing thermal sensor connection
Positive events - I think we have a guardian angel:
- Nikolay and Camo are able to do a repair as John Captains the boat
- Re-fueling was looking grim - thanks to the canal agent we are able to get fuel at Shelter Bay
- Avoided pirates off Nicaragua - possibly the sea state help to discourage any nearby pangas
- Geary and Lois make the right choice to step off
- We were able to find a harbor where we could stop and evaluate the boat and crew

Fried bow thruster wire![]() |
| Fried bonding wire to bow thruster |







Comments
Post a Comment