July 24 , 2020 - The Amartech seal system - UNBOXED! Marina Vallarta, Puerto Vallarta, Mexico

July 24 , 2020 - The Amartech seal system - UNBOXED and Installation commenced!  Marina Vallarta, Puerto Vallarta, Mexico

With a relief we have now opened the crate and are relieved to see that all the parts are in place and undamaged!  Now begins the process of installation and a soon-to-be splashed Raven.

Good progress today installing the tube (with cutlas bearings) and the Amartech Stand-by seal.  Next will be installation of the shaft and AxiSeal (stuffing box) along with the propeller and rudder.

Bad news is we lost power overnight due to an electrical storm and all the freezer contents need to go.  Too disgusting a photo to be added for viewing .....

On the bright side Ed informs me that the shaft tube has additional fiberglass plies in the middle than the prior tube making this one much more durable.  It can be noticed in the photo below how the tube walls thicken as you move away from the ends.  The stainless steel fittings appear much more robust than the previous bronze FixiPack stuffing box.  A much improved design from the original 2008 design!


Stand-By seal installed

Illustration of Stand-by Seal and AxiSeal

Ready for drive shaft, propeller and rudder installation






Comments

Popular posts from this blog

January 11, 2023 - Van Isles, BC - On the hard

August 25, 2025 - Everett

June 3 - June 16, 2024 - Wrangell