October 23 2020 - Haul Out - NEW Wesmar Stabilizer Housings

October 23, 2020 - Haul Out - NEW Wesmar Stabilizer Housings

After two days, two people from Boat Snake Yacht Services buffed up the hull with fantastic results.  Looks like any paint touch up to the hull is minimal (meaning a couple of small chips).

Meanwhile, the Wesmar housings have been removed and NEW HOUSINGS have been installed through the 6" hull/block.  New actuators and lever arms will be installed next after we apply fresh paint over the interior hull area and tops of the fins.

Since there were newer 3/8" hydraulic hoses running from the reservoir to the actuators, we had S-3 remove the old 1/2" hydraulic hoses, that were capped off, from the boat.  AMAZINGLY - they ran aft down the boat along the fuel tanks, to the back of the engine room, and then forward to the reservoir under the engine.  It was at least 35 feet of hose to reach the actuators that are 10 feet away!

The smaller hose (3/8") and shorter run looks to have been an attempt to improve performance.  Wesmar agreed with using the 3/8' hoses, and with the controllers moved to the actuator (from the reservoir) we expect better responsiveness from the system.

We have also had Yacht Services remove the inferior PLASTIC SEA STRAINER and WOOD BACKING BLOCK in the lazarette for the water maker and install a proper sea cock and cap off this location.  The plan is to use an existing sea cock that is in the Utility Room (used for a removed Grunert Freezer) for the water maker.  We will move the LP water pump also to this location which should give us better water quality and pressure.

Our Wood Whisperer has done an excellent job of touching up the water damaged spots and open holes.

And we are well into removing the faux teak from the swim step.  We are finally settling in on a plan to go with a gel-coat swim step.  CSR is looking at ordering a template from Gibco called Flex-Mold that will create the same non-skid pattern that is used on the rest of the deck.   https://gibcoflexmold.com/106-gfo/ 

Hull being buffed

New Housing

New Housing

Old housing removed - will paint hull area around the housing

New lever arms

New actuators

New parts

Exterior hull

Six inches of hull

Exterior backing plates installed

Housing going into hull

Housing installed

Florida art removed and holes filled - Northwest art to be installed

Faux teak being removed


Comments

Popular posts from this blog

January 11, 2023 - Van Isles, BC - On the hard

August 25, 2025 - Everett

August 18, 2025 - Gowland Harbour