November 16, 2020 - Splash Raven
November 16, 2020 - Splash Raven
After five weeks on the hard we accomplished the critical repairs requiring the haul out. In parallel we also accomplished several other repairs around the boat!
![]() |
| Raven going into the water on a rainy day |
CSR accomplished the following:
- Buffed hull
- Removed the failing faux-teak from the swim platform
- Repair cap rail paint at seams
- Identify and repaired laz water leak
- Add 1,000 lbs of ballast
- Bottom paint touch up
- Paint new stabilizer fins
- Removed three ladder cleats and touch-up holes
- Applied PropSpeed at fin through hull fittings
- Repaired hull production break seams
- Touch-up stabilizer bilge bay paint
S-3 Maritime accomplished:
- Removed and Replaced stabilizers
- Removed old stabilizer hoses
Yacht Services accomplished:
- Removed flybridge sliding doors and acquired new replacement rail and bearings
Geary accomplished:
- Replaced port camera
- Replaced bilge pump counters (6)
- Repaired bow faucet door
- Replaced bow sea water and fresh water faucets
- Replaced flybridge stereo speakers
- Replaced windshield washer control valve
- Replaced swim step wash down spray nozzle
- Sealed air leak in electrical room vent
- Repaired engine room electrical switch
- Clean, clean, clean and organize engine room
AND - over the weekend we found a new home for our Magnum cookware. A sailor from Olympia Yacht Club (Curtis D.), who knows one of our fellow Selene owners (Rick P.), gave our cookware a home aboard his Catalina 36!

Comments
Post a Comment