November 16, 2020 - Splash Raven

November 16, 2020 - Splash Raven 

After five weeks on the hard we accomplished the critical repairs requiring the haul out.  In parallel we also accomplished several other repairs around the boat!


Raven going into the water on a rainy day



CSR accomplished the following:

  • Buffed hull
  • Removed the failing faux-teak from the swim platform
  • Repair cap rail paint at seams
  • Identify and repaired laz water leak
  • Add 1,000 lbs of ballast
  • Bottom paint touch up 
  • Paint new stabilizer fins
  • Removed three ladder cleats and touch-up holes
  • Applied PropSpeed at fin through hull fittings
  • Repaired hull production break seams
  • Touch-up stabilizer bilge bay paint
S-3 Maritime accomplished:
  • Removed and Replaced stabilizers
  • Removed old stabilizer hoses
Yacht Services accomplished:
  • Removed flybridge sliding doors and acquired new replacement rail and bearings
Geary accomplished:
  • Replaced port camera
  • Replaced bilge pump counters (6)
  • Repaired bow faucet door
  • Replaced bow sea water and fresh water faucets
  • Replaced flybridge stereo speakers
  • Replaced windshield washer control valve
  • Replaced swim step wash down spray nozzle
  • Sealed air leak in electrical room vent 
  • Repaired engine room electrical switch
  • Clean, clean, clean and organize engine room

AND - over the weekend we found a new home for our Magnum cookware.  A sailor from Olympia Yacht Club (Curtis D.), who knows one of our fellow Selene owners (Rick P.), gave our cookware a home aboard his Catalina 36!

Comments

Popular posts from this blog

January 11, 2023 - Van Isles, BC - On the hard

August 25, 2025 - Everett

June 3 - June 16, 2024 - Wrangell