November 27, 2020 - Progress on the next round of repairs .....
November 27, 2020 - Progress on the next round of repairs .....
There was good progress on our list over the last few days. We service on the main engine was completed with the coolant flush and the 25 kW generator was also completed with a coolant flush and re-installation of new sound dampening panels.
And the new washing machine has been installed, new sound dampening liner for the 6 kW has started, the mystery switch has been resolved and the Maretron DSM 410 installation has started.
Expect this week to be another week of big progress with completion of:
- Washer installation
- DSM410 installation (P/H and master stateroom)
- 6 kW sound dampening, re-installation of 6 kW and coolant flush
- Installation of new rocker switches (mystery switch was for compass and rudder lights)
And maybe a few more smaller projects .....
![]() |
| Raven at Miller and Miller |
![]() |
| Maretron 410 installed in P/H |
![]() |
| New Washing Machine |
![]() |
| Old sound dampening material removed and new being installed |
![]() |
| Flybridge MFD removed to access wiring to mystery switch (compass and rudder light) |