December 11, 2020 - Nearing completion with this round .....

December 11, 2020 - Nearing completion with this round  .....

The list is now down to a few items to check and verify proper operation such as:

  • Bow thruster wiring connections
  • Hydraulic steering pressure - top off
  • AutoAnchor error message
And only two additions to go:
  • Hailer loudspeaker
  • Hot water mixing valve

The pop-up cleats look AWESOME, allowing safer access to the swim platform when retracted, and they are very stout!  With the cleats installed, the down rigger mounts can be installed covering the stern access holes that have been cut into the hull above the cleats.

New pop-up Seasmart cleats, retracted

New pop-up Seasmart cleats, extended

Relocated tank monitor and new Fusion stereo remote


I have managed to learn more details about the boat by mapping out the AC charging system and the NMEA 2000/Garmin Marine Network.

Next week we expect to reposition the boat to Yacht Services to have the water maker intake line modified, finish installation of the flybridge hatch trim, and ..... installation of hydronic heating (BIG project).