April 28, 2021 - Progress Continues ....

April 28, 2021 - Progress Continues ....

Major progress on completing the teak swim step at Miller and Miller.  The surface has been prepared and the panels are being bonded on with the aid of some batteries to add pressure during the cure process.  The trim pieces are numerous and have to be fit and beveled to accommodate the staples and tolerances of the swim step area.  A LOT of detail work that has been well thought out.


Teak panels bonded down and weighted with batteries (grey surface is backside of other panels)

Filler/smoother applied to the surface (tan color)

Numerous trim pieces

Weighted down panels curing and gray backside of next panels showing

Weighted down panels curing and gray backside of next panels showing
Weighted down panel

Large panels in place - on to the trim pieces


Comments

Popular posts from this blog

January 11, 2023 - Van Isles, BC - On the hard

August 25, 2025 - Everett

June 3 - June 16, 2024 - Wrangell