October 25 - 31, 2021 - Miller & Miller Boatyard

October 25 - 31, 2021 -Miller & Miller Boatyard

Planned work includes:

  • Install side cockpit doors
  • Windlass maintenance
  • Diagnose & repair Balmar alternator dash lamp
  • Replace 12V outlets with USB
  • Replace guest head exhaust fan
  • Caulk repair on swim step
  • Reposition canvas snaps - starboard aft corner
  • Replace microwave
  • Asses installation of an additional Pompanette Platinum Series helm chair
ShelfGenie to measure for salon pull-out shelf

Allied Marble to repair chip in counter top

Gallery Marine to perform mechanical service of the engine, transmission and both generators.




Fit check of side doors
(protective paper covering in place)




Windlass diassembled




 Growing list of things not found during survey:

  • Balmar alternator dash light in-op
  • P/H rope light connected with a 110V extension cord
  • Poor water pump wiring
  • A/C control in bunk room not connected
  • AutoAnchor wiring is faulty
  • Mystery toggle switch on F/B is for compass/rudder indicator light
  • Leak path under name plate
  • Corroded terminal buss block
  • Faulty VHF/AIS wiring and failed antenna
  • Gelcoat blisters - no evidence noted during survey
  • Failing bottom paint - reported renewed in the fall of 2019
  • Pitted drive shaft
  • Failing shaft bearings - even though it had been serviced 2015 and 2016
  • Bow thruster wiring issue
  • Stabilizer system in need of significant maintenance even though reported they had been serviced in September 2019
  • Failed Balmar regulator and missing thermal sensor connection

 