November 24, 2021 - S-3 Maritime

 November 24, 2021 - S-3 Maritime

It's been a busy week completing projects.

Miller and Miller completed:

  1. The cockpit side door panels were installed and came out exceptionally well.  
  2. Completed windlass maintenance.
  3. Balmar alternator dash light has been replaced.
  4. Two 12V plugs have been replaced with USB plugs.
  5. Guest head fan has been replaced.
  6. Port aft canvas snaps repositioned.
  7. Caulk touch up complete.
  8. And new microwave has been installed!
S-3 Maritime / Keypower completed:
  1. Replaced twisted oil cooler hose.
  2. Installed new pressure gauge.
  3. Repair the worn coupler.
  4. Rebuild the get-home drive with new bearings and viton seals.
Next week we expect to have the get-home installed and perform a sea trail.  Also will grease the stabilizers and inspect the hydraulic fluid filter.

Not quite done yet as we prepare for next season.  Next on the list will be:
  • Replace seals on the HP pump of the water maker to eliminate weeping.
  • Inspect transmission and stabilizer heat exchangers
  • Install new Pompanette Platinum Series helm chair
  • Install new ShelfGenie shelves in the salon
The list is beginning to get smaller!


New cockpit side doors with Raven logo - port side shown.





Repaired coupling


NEW Microwave




Comments

Popular posts from this blog

January 11, 2023 - Van Isles, BC - On the hard

August 25, 2025 - Everett

June 3 - June 16, 2024 - Wrangell