January 12, 2023 - Van Isles, BC - On the hard

January 12,  2023 - Van Isles, BC - On the hard

Progress continues.  The new 2" thru-hull drilled, ball valve installed and routing completed for the blackwater discharge hose.  MUCH easier access and removal of a restriction in the line as had stepped down to a 1.5" thru-hull.

The removable kayak davit was test fit and is in the final stages of modification extending its reach and adding features to make it removable.

Touch up on interior wood is completed and repair of failing cap rail paint is well underway.

Stabilizers are hung and in the final stages of reassembly.

Disappointing discovery as we learned that the Garmin Panoptix PS51-TH forward looking sonar transducer does not have a long enough stem to work at the desired location.  The hulls dead rise exceeds the installation limits.

Good news is Ian was able to contact Pat Bray of Bray Yacht Deign and gain information about our bulbous bow.




New blackwater discharge installation


Old blackwater discharge with hose reduction at far end


Removable kayak davit

Rail cap repair - in-work