October 18 - November 19, 2024 - Everett: Haul Out
We got an early start for our trip back to Everett as we planned a haul-out to address bottom paint, hull buffing and cap rail paint repairs. The cruise was uneventful under a cloudy sky arriving with time to spare for our haul out.
Definitely a good time to haul as bottom paint needed attention due to a loose electrical bond at the starboard engine raw water inlet (the paint was being sacrificed like a zinc) and wear along the bulb. And all the raw water inlets needed cleaning to remove marine growth. The prop speed treatment of the running gear was also in need of refreshing. Inspection inside of the bulb reveals minimal marine growth with silt accumulation.
 |
| Raven hauled out |
 |
| Growth on the sea water inlets |
 |
| Growth in raw water strainer |
 |
| Growth in raw water strainer |
 |
| Prop Speed in need of repair |
 |
| Bottom paint sacrificed due to lose bonding wire at the sea water strainer |
 |
| Inside of bulb in good condition |
 |
| New, easy access, sea water inlets |
 |
| Refreshed Prop Speed |
 |
| New winch for kayaks |
 |
| Fresh bottom paint and improved arrow on bulb |
Comments
Post a Comment